Chiswick Tower
- Client: Workman LLP
- Scope: Removal of existing pressure plates for the main front elevation to allow for supply and installation of new extruded rubberized gaskets, extruded mullion and transom cover caps that were colour matched and finished with a polyester powder coating. Supply and installation of bespoke fabricated louvre boxes to enhance natural ventilation.